Racing Performance Center
Fayston, Vermont
The Green Mountain Valley School is a one hundred-student prep school located close to Sugarbush Mountain and Mad River Glen in Fayston, Vermont. With an aging sports facility, the School built a new 33,000 square foot Racing Performance Center. Completed in the Fall of 2014, the facility includes a large gymnasium, weight room, indoor bike training room, fitness room, physical therapy center with a swimming pool, offices for the coaches, and ski tuning center with state of the art equipment.
General Contractor: Engelberth Construction, Inc.
Structural Engineer: Hardy Structural Engineering, LLC
Cummington, Massachusetts
This 4,000 square foot un-insulated summer use only music performance barn was completed in 1998. Greenwood Music Camp is America's oldest continuously running summer camp.